POST-CONSTRUCTION CLEANING · AFTER RENOVATION · BUILDER CLEANING
Post-construction and renovation cleaning in Delhi NCR.
Fine construction dust out of every corner and track, and cement, paint and putty off floors, tiles, glass and fittings.
Thanks! We'll call you shortly.
Continue on WhatsApp- 15+ years of experienceServing Delhi NCR since 2011
- Our own verified teamPolice-verified, trained, in uniform
- Fixed price before we startNever above the price we confirm
- No hidden chargesGST invoice for every job
- Written warrantyTermite up to 3 years*, bed bugs up to 6 months*
- Free revisitIf pests are still active after 2–4 weeks
- CIB&RC-registered productsUsed as per the label; odourless gel in kitchens
- Herbal option availableFor homes with babies, elders or pets
- Same-day service available*Book before 12 pm
- Photo report on WhatsAppBefore/after photos and chemicals used
- Same team on repeat visitsThe same technician where possible
- No selling at your doorOur technicians never push plans
*Termite warranty depends on the chemical chosen and is written on your job card. Same-day service depends on slot availability.
Quick answer
Post-construction cleaning with AHC is priced at the home deep-clean rate plus 25%, including GST: about ₹5,199 for a 2BHK, empty or furnished, or a fixed quote from photos. The team vacuums the dust first so it doesn't turn to mud, scrapes off cement splashes and paint drops with flat blades, removes putty, tile haze and stickers with the right solvent, then cleans every room ceiling to floor and machine-scrubs the floors. Book it after the last painting and carpentry are finished, so the dust doesn't come back.Post-construction cleaning prices
| Home size | 1RK | 1BHK | 2BHK | 3BHK | 4BHK | 5BHK+ |
|---|---|---|---|---|---|---|
| Empty or furnished home, after construction or renovation | ₹3,499 | ₹4,099 | ₹5,199 | ₹6,499 | ₹7,899 | From ₹12,499 |
Swipe to see the whole table
Prices include 18% GST: the home deep-clean price plus 25% for the extra time, scrapers and solvents, confirmed from your photos before the visit, never at the door. Very heavy jobs (thick cement on floors, paint over large areas) and villas are quoted from photos or a free visit. Source: AHC price book, 6 Oct 2026.
Cement, paint and putty: what comes off and how
| Mess | Where | How we remove it | Result |
|---|---|---|---|
| Fine cement and POP dust | Everywhere: tracks, drawers, fans, ledges | Vacuumed first, then wiped; never wet-mopped straight away | Comes off fully |
| Cement splashes | Vitrified and ceramic tiles, fittings | Softened and lifted with a flat blade and a tile-safe cleaner | Usually comes off |
| Grout or tile haze | Tile surfaces after grouting | Haze remover suited to the tile | Usually comes off; old haze on matt or "lappato" tiles can be stubborn |
| Paint drops (emulsion) | Floors, glass, fittings | Scraped with a flat blade; residue lifted with a solvent | Usually comes off |
| Enamel or oil paint drops | Doors, grills, floors | Solvent and blade, slowly | Usually comes off; may leave a faint mark |
| Putty and wall-care dust | Floors and skirting | Scraped, then scrubbed | Comes off |
| Stickers and protective film | Glass, sanitaryware, appliances | Peeled, glue removed with a solvent | Comes off |
| Paint or cement on marble, Kota or other natural stone | Floors and slabs | Blade and neutral cleaner only; no acid | Lightens; stains soaked into unsealed stone may stay |
Swipe to see the whole table
Tile installers advise removing grout haze within about 48 hours of grouting, before it bonds to the tile; ask your contractor to wipe it, and we'll remove what's left.
Sources: Tile Warehouse, "Grout Haze" (easiest to remove within 48 hours; harder on lappato tiles); Houzz India, citing the Marble Institute, on acids and marble.
What a post-construction clean covers
- Dust first: every surface vacuumed, including window and sliding-door tracks, wardrobe and kitchen drawers, AC vents and fan tops
- Ceiling to floor: fans, lights, switchboards (dry), doors and frames, windows and grills, skirting
- Kitchen: cabinets inside and out, slab, tiles, sink and fittings, stickers off appliances
- Bathrooms: tiles, fittings, sanitaryware, glass, all with cement and paint marks removed, and descaled
- Glass: windows and partitions scraped clean of paint and cement, then polished
- Floors: marks scraped off, then machine-scrubbed, twice where the dust is heavy
- Balconies and the entrance
After renovation at home
Renovating one room or the whole flat while you live in it means the dust gets into the rooms nobody worked on too. Book the clean once the last coat of paint is dry and the carpenters are done; cleaning earlier only gets dusty again. Tell us which rooms were worked on: those get the heavy clean, and the rest a deep clean, priced room by room.
If the work was in the kitchen or bathrooms, book pest control at the same time: cockroaches move in through new gaps around pipes and fresh cabinet joints. Cockroach Control →
For builders and contractors
Builder cleaning before handover, priced per flat or per sq ft for a tower or a project, after a site visit.
- A fixed rate per flat type (1BHK, 2BHK, 3BHK), with a written scope your site team can check against
- Flats cleaned floor by floor, in the order your handover schedule needs
- Before-and-after photos per flat, for your handover file
- One GST invoice for the project
Not included, process, before, after, safety
Not included
- Removing construction debris, rubble or leftover material (your contractor's job)
- Repainting, polishing marble, regrouting or repairs
- Paint stains soaked into unsealed natural stone or upholstery
- Outside windows and facade at height
How it works
- Send photos of the floors, glass, kitchen and bathrooms on WhatsApp, with the home size and city.
- Fixed price including GST, in writing; very heavy or large jobs after a free visit.
- Dust first: vacuum every surface and track.
- Marks next: scrape and solvent-clean cement, paint, putty and stickers.
- Clean ceiling to floor, kitchen and bathrooms descaled.
- Floors machine-scrubbed, then a walk-through and photos. Missed something? Tell us within 24 hours and we redo it free.
Before we arrive: debris and leftover material removed; water and power on; painting and carpentry finished; tell us the floor type (vitrified, marble, Kota, wood).
After the clean: keep windows open for a day to clear the last of the paint smell; let floors dry before furniture goes in.
Safety: fine construction dust can contain silica, so our team wears masks and vacuums before wiping. Blades are held flat on glass and glazed tiles to avoid scratches. Solvents are used with the windows open, and never on marble.
Post-construction cleaning: your questions
How much does cleaning after renovation cost?
Can cement be removed from tiles?
Can paint drops be removed from floors and glass?
When should I book?
Do you remove construction debris?
How long does it take?
Related
Related: Move-in / move-out cleaning · Home deep cleaning · Office cleaning
Get your fixed price in 2 minutes.
Pick your home size and services and see one fixed price, including GST. Your final bill will never be more than that.